Ukrainian Defence Minister Yevhenii Khmara has said it will take the Russians several months at least to raise the damaged section of the Crimean Bridge.
Source: Khmara speaking at a meeting between President Volodymyr Zelenskyy and UK Defence Secretary Wes Streeting, as reported by Ukrainian news agency Ukrinform
Quote: "We estimate the time they will need to lift this structure [the arch and road section of the Kerch Bridge – ed.] and tow it away to be several months at least."
Details: Commenting on the damage to the bridge, Khmara noted that the Russians are currently inspecting it.
"We can clearly see that they are currently carrying out their assessment. They have sent divers down and are working out the details of how they can raise the damaged section of the bridge and tow it away," the defence minister said.
Background: On the morning of 16 November, the Russian-installed authorities in Crimea reported that the Crimean Bridge had been hit, resulting in traffic restrictions. On the morning of 17 November, it was reported that one of the Crimean Bridge's arches and a section of its roadway had fallen into the sea following a second attack. The bridge was closed to both rail and road traffic. President Volodymyr Zelenskyy reported that during the night of 16-17 November, the defence forces deployed Palianytsia drones to strike the road section of the Crimean Bridge, while Neptune missiles and Ruta and FP-1 drones, as well as a Flamingo missile, were used to hit the railway section. The Security Service of Ukraine revealed details of their successful multi-stage special operation to strike the Crimean Bridge , planned jointly with other branches of Ukraine's defence forces. The strikes completely destroyed one of the bridge's metal arches and the road span beneath it. On 19 November, Ukraine's General Staff and Defence Ministry confirmed the third attack on the Crimean Bridge this week, which damaged the railway section of the bridge.

